Backgrounder: Federal and provincial governments invest in essential building upgrades throughout Alberta
Town of Bonnyville; Town of Edson; Town of High Level; Municipal District of Lac La Biche County; Town of Peace River; Town of St. Paul
Northern Alberta Retrofit, Repair, and Upgrade Projects
This bundle of eight projects includes retrofits, repairs and upgrades in five communities in Northern Alberta:
• The Bonnyville Provincial Building will have its domestic water lines and fixtures, an elevator, and its motor control centre, transformer and power feed replaced, and barrier free access will be improved.
• The High Level Provincial Building will have its variable air volume boxes, air balancing, and interior lighting replaced.
• The Lac La Biche Provincial Building will have its elevator replaced.
• The Peace River Provincial Building will have its heating, ventilation, air conditioning (HVAC), and controls replaced.
• The Peace River Warehouse Building will have its roof and flashing replaced.
• The Peace River Courthouse will have its interior finishes renewed.
• The St. Paul Courthouse will have its elevator cab and controls and domestic water line and fixtures replaced, and its exterior envelope and interior finishes will be renewed.
• The St. Paul Provincial Building will have its elevator cab and controls and domestic water lines and fixtures replaced.
$4,747,772
$1,866,373
City of Calgary; Town of Drumheller; City of Edmonton; Town of Stony Plain
Alberta Province-wide HVAC Replacement Projects
This bundle is for non-remote projects to support HVAC upgrades to seven buildings in four communities:
• The McDougall Centre in Calgary will modify its cooling system.
• The Drumheller Provincial Building will see upgrades to its existing ventilation system and supply and return air ducts.
• The Edmonton Winnifred Stewart School will have its existing heating units replaced, supply and return air system installed, and exterior operable windows replaced.
• The Queen Elizabeth II Building in Edmonton will have its server room cistern exhaust system and pump room ventilation system modified and repaired.
• The Alberta Legislature Building in Edmonton will have the coil in its south air handler replaced.
• In Stony Plain the Courthouse and Provincial Building will have HVAC upgrades completed, including chillers, air handling units, supply and return air ducts, and controls.
$7,264,000
$1,816,000
Municipal District of Lac La Biche County; Town of Peace River
Lac La Biche and Peace River Retrofit, Repair, and Upgrade Projects
The bundle provides funding for upgrades and repairs for one project in Peace River and one in Lac La Biche.
• Peace River Correctional Centre will have its water line to the tower replaced.
• Lac La Biche Parks Workshop will have its security fence and lighting improved.
$1,800,000
$500,000